Built for Rail.
Trusted Worldwide.
High-performance bogie parts and industrial fasteners, manufactured to ISO 9001:2015 and EN 15085 standards — delivered to rail operators across more than 10 countries.
Certifications & Standards
Every product leaves our facility backed by internationally recognized certifications, and certified inspection personnel.
Quality Management System
Certified to ISO 9001:2015 across all production and support processes — from raw material procurement through final inspection, documentation, and dispatch.
QMS CertifiedRailway Welding — EN 15085
Certified by ECWRV (European Committee for Welding of Railway Vehicles) for the welding of railway vehicles and components. Classification level CL1.
EN 15085 CL1NDT Certified Personnel
Non-destructive testing personnel certified to TS EN ISO 9712:2022 at Level 2. Four inspection methods are qualified and applied in-house on all critical welds and structural components.
45+ Years of Industrial Excellence
Operations began in a small workshop, specializing in custom bolts for cement factories.
Management transferred to a single entrepreneur, marking the start of rapid expansion.
Reorganized as a limited company, focusing on special bolt manufacturing sector.
Entered the railway industry with a new 5,000 m² production facility.
Transitioned to incorporated company with a new 25,000 m² facility.
Production Capabilities
Our 25,000 m² facility operates 40+ machines across six capability areas — all under one roof, from raw material to certified finished part.
CNC Machining Centers
Horizontal and vertical machining centers for complex milling, drilling, and boring of structural railway components to tight tolerances.
HMC / VMCCNC & Conventional Turning
CNC and universal lathes for precision turning of axle boxes, bushings, pins, and rotational components.
CNC + UniversalRobotic & MIG/MAG Welding
Welding robots for repeatable high-volume joints, backed with MIG/MAG stations. All structural welding is performed by EN 15085-certified operators.
EN 15085 CL1ERA Machinery · Since 1978
Every part we manufacture carries the responsibility
of the rail system it serves.
Ready to Work Together?
Tell us about your railway component requirements and our engineering team will respond within 24 hours.

